Morgan Assisted Living Apartments

Project Details

Client

Buxton

Address

14 Elizabeth Street, Glen Iris

Basement Levels

1

Engineered piling pad (m2)

525

Piles

105 Retention Piles at an average depth of 5 m

Ground Anchors
Capping beam (l/m)

233

Shotcrete (m2)

570

Environmental Remediation Summary

Onsite abatement of asbestos contaminated soil under asbestos conditions in a high-density residential setting including completing portion of constructions under asbestos conditions. Validation and reporting on fill/ natural interface prior to bulk excavation. Track, load, cart, and dispose of chemically contaminated fill post abatement. Capping and sealing of contaminated material on site.

Bulk and Detailed Excavation

~18,700m3