Social Housing Bills Street Hawthorn

Project Details

Client

Hansen Yuncken

Address

Social/ public housing 1-12 Bills Street Hawthorn

Basement Levels

450

Engineered piling pad (m2)

650

Piles

70 retention piles and 340 foundation piles to 13 mbgs

Ground Anchors

240

Capping beam (l/m)

130

Shotcrete (m2)

369

Environmental Remediation Summary

Onsite abatement of ~1,000m3 of asbestos contaminated soil under asbestos conditions in a high-density residential setting including completing portion of constructions under Asbestos Conditions. Validation and reporting on fill/ natural interface prior to bulk excavation. Track, load, cart, and dispose chemically contaminated fill post abatement. Capping and sealing of contaminated material on site. Ongoing: A sewerage line and surrounding fill material as uncovered during excavation was found to be contaminated with inert material and asbestos. Straightline is continuing the scope of works while managing, separating, and segregating previously unidentified contaminated material during the build.

Bulk and Detailed Excavation

18,000 m3 of mudstone