Social Housing Bills Street Hawthorn
Project Details
Client
Hansen Yuncken
Address
Social/ public housing 1-12 Bills Street Hawthorn
Basement Levels
450
Engineered piling pad (m2)
650
Piles
70 retention piles and 340 foundation piles to 13 mbgs
Ground Anchors
240
Capping beam (l/m)
130
Shotcrete (m2)
369
Environmental Remediation Summary
Onsite abatement of ~1,000m3 of asbestos contaminated soil under asbestos conditions in a high-density residential setting including completing portion of constructions under Asbestos Conditions. Validation and reporting on fill/ natural interface prior to bulk excavation. Track, load, cart, and dispose chemically contaminated fill post abatement. Capping and sealing of contaminated material on site. Ongoing: A sewerage line and surrounding fill material as uncovered during excavation was found to be contaminated with inert material and asbestos. Straightline is continuing the scope of works while managing, separating, and segregating previously unidentified contaminated material during the build.
Bulk and Detailed Excavation
18,000 m3 of mudstone