Victoria Vine
Project Details
Client
Hickory
Address
1-57 Wellington Street Collingwood
Basement Levels
3
Engineered piling pad (m2)
1800
Piles
151 retention piles to 13 metres below ground surface (mbgs)
Ground Anchors
170
Capping beam (l/m)
360
Shotcrete (m2)
2200
Environmental Remediation Summary
Onsite abatement of ~2,000m3 of asbestos contaminated soil. Completion of part of the excavation works under asbestos conditions. Track, load, cart and dispose ~3,000m3 of chemically contaminated fill post abatement.
Bulk and Detailed Excavation
~85,500 cubic metres of Siltstone