Victoria Vine

Project Details

Client

Hickory

Address

1-57 Wellington Street Collingwood

Basement Levels

3

Engineered piling pad (m2)

1800

Piles

151 retention piles to 13 metres below ground surface (mbgs)

Ground Anchors

170

Capping beam (l/m)

360

Shotcrete (m2)

2200

Environmental Remediation Summary

Onsite abatement of ~2,000m3 of asbestos contaminated soil. Completion of part of the excavation works under asbestos conditions. Track, load, cart and dispose ~3,000m3 of chemically contaminated fill post abatement.

Bulk and Detailed Excavation

~85,500 cubic metres of Siltstone